1. Before installing the LED flood light, in order to ensure the quality of its use after installation, it is recommended to conduct a detailed inspection of the flood light present before installation to see if the appearance of the LED flood light is damaged and whether the accessories are complete. After-sales service, etc., each item must be carefully checked.
2. After the appearance is not damaged and the accessories are complete, you need to prepare for the installation of the LED floodlights after they arrive at the construction site. First, organize the installers according to the installation drawings attached to the factory, and first connect a few floodlights to try to install the drawings correctly. Or not, if you have the conditions, you can arrange for one person to test the lights one by one, so as to avoid taking them upstairs and installing them if they are broken and then removing them.
3. It is to remind the installation workers of the importance of fixing and wiring, especially the waterproof of outdoor wiring is very important. Try to review it when fixing and wiring.
4. After the LED flood light is fixed and connected, when it is ready to test light, try to use a universal meter on the main power supply to check whether there is a short circuit in the wrong wire.
5. After all the LED floodlights have been tested, try to light them for as long as possible, and check again on the second and third days. After doing this, all of them are good, and there will be no problems later.